PROJECT

The K Club Hotel Extension

LOCATION
Straffan, Co. Kildare.

PROJECT SUMMARY
Groundworks, Foundations, Services & Car Park for Hotel Extension.

CLIENT
M.B. McNamara Construction Ltd

Main Contractor:

Services:

Drainage, Tanks & Utilities

Roads & Car Parks

Substructures

Concrete Floors and Frames

Design Team:

Architect: Henry J Lyons

Engineer – M&E: N/A

Engineer: OCSC

PQS: N/A

Key Features:

750m³ reduce level excavation.

Excavation for foundations for 962m² building including tying in new foundations to existing.

750m³ mass filling of concrete in poor ground conditions under foundations of 962m² hotel extension.

Constructing reinforced concrete foundations and rising walls.

Concrete works for 962m² building extension including tying in new slab to existing.

800m of drainage with pipe sizes ranging from 100mm to 300mm.

Installation of 55,000 litre underground pre-cast concrete foul water storage chamber and pump chamber up to 6.00m deep, including pumps and all related M&E work.

455m of directional drilling to install new pumped rising main from foul pumping chamber, under manicured lawns of hotel, fairways of golf course to minimise disruption and reinstatement for client.

550m of LV and ELV ducting.

 750m² of tarmac access roads.

4,860m² of topsoil to soft landscaping works around completed hotel extension.