PROJECT
The Tech Group – West Pharma
LOCATION
Damastown Industrial Park Mullhuddart Dublin 15 Co. Dublin
PROJECT SUMMARY
Site Development, Substructures and Concrete Floors for 5,500m2 medical device plant.
CLIENT
Ardmac
PROJECT
The Tech Group – West Pharma
LOCATION
Damastown Industrial Park Mullhuddart Dublin 15 Co. Dublin
PROJECT SUMMARY
Site Development, Substructures and Concrete Floors for 5,500m2 medical device plant.
CLIENT
Ardmac
Drainage, Tanks & Utilities
Roads & Car Parks
Substructures
Concrete Floors and Frames
Architect: DMOD
Engineer – M&E:
Metec Consulting Engineers
Engineer: McElroy Associates
PQS:
14,590m³ reduce level excavation.
890m³ excavation for foundations for building.
6,670m³ of 6F2 hardcore placed as fill below floors, roads and car park.
890m³ of reinforced concrete to pad foundations.
Concrete works for 4,100m² of groundfloor.
650m² of ground floor was to an FM2 Finish.
1,446m² of upper floors.
1300m of surface & foul water drainage from 100mm – 600mm.
3.0 Km of MV and LV ducting.
820m³ attenuation tank.