PROJECT SUMMARY
Groundworks and site finish for 31 new residential units

CLIENT
MB McNamara

Main Contractor:

Services:

Earthworks

Substructures

Drainage, tanks & utilities

Roadways

Design Team:

Architect: Downey Planning and Architecture

Engineer: Roughan and O’Donavan

Key Features:

3500m3 reduce level excavation of site roads and housing layout (31no. Houses)

1.5km site drainage (up to 5m deep) and pump station (25m3 capacity, 10m deep). Install of SUDS attenuation systems including hydro pave (700m2)

Construction of house foundations (precast/raft slabs) excavation, drainage/services, shuttering, tying rebar, pouring concrete, radon system install, insulation install and floor screeds.

500m of welded watermain, 1.2km virgin, ESB and Eir ducting

Completion of site finishes works kerbing , footpaths, brick paving, ground profile shaping, top soiling and roadways