Due to high site costs, developers are pushing new-build footprints to the extreme boundaries of sites and are going down often 2 & 3 stories below ground level. Constructing buildings in these conditions require significant temporary works. Services have to be re-routed away from the building area and temporary propping to the perimeter of the dig is usually required.
We specialise in providing the following temporary propping solutions: Kingpost & infill panels, Sheet piling, Structural steel propping to secant or contiguous piles.