PROJECT
MSD Biotech
LOCATION
Drynam Road, Swords, Co.Dublin
PROJECT SUMMARY
Groundworks and site finishes to new and existing steel frame buildings of a combined area of 260,000sq foot.
CLIENT
L&S Structures
PROJECT
MSD Biotech
LOCATION
Drynam Road, Swords, Co.Dublin
PROJECT SUMMARY
Groundworks and site finishes to new and existing steel frame buildings of a combined area of 260,000sq foot.
CLIENT
L&S Structures
Earthworks | Substructures | Drainage, tanks and utilities | Roads and carparks
Architect: PM Group
Engineer: PM Group
9706m3 reduce level excavation
9700m3 excavation of foundations for building and pile caps
15520m3 of hardcore placed as fill below structures
1835m3 of concrete fill placed below foundations
Excavation and backfill of all internal trenches for new complex double contained process drainage
560m of under slab drainage installed
1700m of radon pipe installed below slab
2282m of double contained process drainage installed 1.5m to 3m deep (stainless steel and polypropylene)
350m of underslab ducting, 1000m of earthing
Completion of all finishes works including duting , kerbing , footpaths, brick paving and roadways
All internal works were completed under strict conditions. A combination of electric plant and diesel plant modified with DPF filters were used to complete all internal works