PROJECT

Point A Hotel

LOCATION
Parnell Street, Dublin 1

PROJECT SUMMARY
Basement excavation, groundworks and site finishes for 8 storey high reinforced concrete frame hotel building

CLIENT
Sheehan and Collins

Main Contractor:

Services:

Excavation | Substructures | Drainage, tanks and utilities

Design Team:

Architect: Morrison Design

Engineer: O’Connor Sutton Cronin

Key Features:

Demolition of underground tunnels (under archaeological guidance) found during investigative works

600m2, 300mm deep piling mat installed and attendance to piling rig

3500m3 reduce level dig of site

161no. piles cropped and pile grinding of 91no.

200m of under slab drainage network

Project works were completed on program despite the logistical challenges of working within the Dublin 1 area and the restricted nature of the site.