PROJECT

Tesco

LOCATION
Liffey Valley Shopping Centre, Dublin 22

PROJECT SUMMARY
Concrete substructure works to 140,000sq foot stilted steel frame retail unit with ground-level carpark

CLIENT
Precision Construction

Main Contractor:

Services:

Earthworks

Substructures

Design Team:

Architect: Joseph Doyle Architects

Engineer: EIRENG

Key Features:

100 tonne of foundation rebar supplied and tied

1371m3 concrete poured to all foundations

193 sets of holdin g down bolts assembled and set

Shuttering and pouring of travellator base

All foundation works completed inside four weeks.